Bill of Material
Vista supports traditional BOM management with single-level part formats that recognizes the materials and components required to build end parts. In addition, Vista optionally introduces multilevel BOM management that incorporates not only single-level components and material requirements, but also internal and external routing steps for complete end assembly visibility, planning, scheduling, and costing. Vista introduces visual engineering technology with indented tree structures and drag-and-drop BOM management.
Method of Manufacturing
Drag and Drop Generation
Alternate BOM
Document Linking
Cost Stored
Expansive Part Number
Critical Path View